Melting · heat completed
Heat 24580 · Furnace A

Completed 27 Oct 2026, 4:50 pm on Furnace A (Melting Bay 1) — AH-1042-PC · Pump Casing · Arka Hydraulics Pvt. Ltd. · SGI SG 500/7.

Fully automatic
Raw materials: 1,000 kg — all by the crane (4 loads from B01, B02, B04)
Alloys: 19.7 kg — all weighed by the bins (3 picks)
Cored wire: 20 m fed
Charge mix the crane's loads · the crane's auto-fill on · 4 lifts charged onto it (1,000 kg)
The heat
Heat24580
Melt no.6701191
Charging weight1,000 kg · charged 1,004.6 kg
Started27 Oct 2026, 3:23 pm
Charge mix at27 Oct 2026, 3:32 pm
Completed27 Oct 2026, 4:50 pm · 1 h 27 min on the furnace
Charge mix
Raw materialkgOf chargeBy the craneBy hand
Pig Iron340 kg34 %340 kg
1 load · B01
—
MS Scrap Bundles200 kg20 %200 kg
1 load · B02
—
SG Foundry Returns460 kg46 %460 kg
2 loads · B04
—
FeSiMg Core Powder
as Mg Cored Wire 13 mm · 20 m
4.6 kg0 %fed as wire—
AlloyAimTo addAdded on the charge mixBins weighed (all stages)Typed at a bin
C3.65 %4.9 kg5.1 kg5.1 kg—
Si2.45 %10.7 kg11.4 kg11.4 kg—
Mn0.32 %0 kg———
P0.035 %0 kg———
S0.012 %0 kg———
Cu0.45 %3.1 kg3.3 kg3.3 kg—
Mg0.045 %0 kg———
The boards during the heat — Bay 1 crane
BoardDuring the heat
UWB tag — the crane's X
chargeMix/data
alive 100 % (87 of 87 min) · 653 messages · signal 821.7 (796–842) · X valid 100 % · status ok 100 %
PLC — SEC, the hook and the bins' scales
bin/data
alive 100 % (87 of 87 min) · 653 messages · scales B1 ✓ B2 ✓ B3 ✓ B4 ✓ B5 ✓ B6 ✓ B9 ✓ · hook OK 100 %
The little bars: the heat in steps — green up, yellow / orange gaps, red mostly down or silent.
Lab results

I-Initial 4:07 pm · I-Final 5:08 pm

This mail goes by itself when a heat is completed while Bunkers & crane is on (Settings → App settings). Who gets it: Settings → App settings → Heat mail; it is sent with the email configuration in use (Settings → Email).